Project 1997
September 12, 2011 by irwanbee · Leave a Comment
Beberapa Proyek PT. LISA CONCRETE INDONESIA 1997
| RCP Dia. 300 – 1500 mm | PT. Pakuwon Darma | Griya Asri & Puri Asri (Housing) |
| RCP Dia. 500 mm | PT. Jawa Nusa Wahana | Pantai Mentari (Housing) |
| RCP Dia. 300, 600, 800 mm | PT. Kentjana Sakti Indonesia | Taman Dayu |
| Box Culvert | PT. Taruna Ganda | Taman Gading (Housing) |
| RCP Dia. 300 – 800 mm | PT. Tunas Jaya Sanur | Puri Matahari (Housing) |
| RCP Dia. 300 – 1200 mm | PT. Dharmala Land | Plaza Segi 8 |
| Curb – U – C Cover | Hazama Corporation | Airlangga University |
Project | Arch Culvert
September 12, 2011 by irwanbee · Leave a Comment
Arch Culvert
Post ini Progress,…
Project 1995
August 10, 2011 by irwanbee · Leave a Comment
Beberapa Proyek PT. LISA CONCRETE INDONESIA 1995
| RCP Dia. 300 – 800 mm | PT. Wijaya Karya | PLTGU Grati |
| RCP Dia. 400 – 1000 mm | PT. Wahana Sampoerna | Sampoerna Cigarette Factory |
| RCP Dia. 500 mm | PT. Dharmala Land | Grande Family View |
| RCP Dia. 1500 mm | Pacific Golf Consultant | Drainage Golf |
| RCP Dia. 800 mm | PT. Chandra Sekawan A | PVC – Wavin Factory |
| RCP Dia. 800 mm | PT. Surya Pontiagung Eng. | Keramik KIA Factory |
| RCP Dia. 600 mm | PT. Mitrabangun Adigraha | Navika Estate |
Project 2000
July 28, 2011 by irwanbee · Leave a Comment
Beberapa Proyek PT. LISA CONCRETE INDONESIA 2000
| RCP Dia. 300 – 600 mm | PT. Nusa Raya Cipta | H.M. Sampoerna |
| L – Shape 750 x 700 x 1000 | PT. Smelting | Ware House Smelting |
| U – Gutter 400/500 – 1000 | PT. Wijaya Karya Beton | Irjat – Madura |
| Leg – Gutter 5000/2000 – 2000 | PT. Gunung Lima Kencana | Irjat – Jombang |
| RCP Dia. 500 mm | PT. Palung Buana | Tootal Thread Indonesia |
| L-Shape 750 x 700 x 1000 | PT. Smelting | Ware House – Smelting |
| Minipile 15 x 20 x 600 | Bpk. Donny | Anggaswangi |
| RCP Dia. 300 mm | PT. Tata Mulia Nusantara | H.M. Sampoerna |
| RCP Dia. 500 mm | PT. Hutan Alam | Juanda – Lanudal |
| Cansteen CA – 200 | PT. Takenaka Indonesia | Pandaan |
| Panel | PT. Angga Jaya Utama | Galeria Matahari – Bali |
| RCP Dia. 300 mm | PT. Meindo Elang Indah | Plastiziser – Gresik |
| Minipile 15 x 20 x 600 | PT. Graha Primula | Villa Bukit Mas |
| Panel | Bpk. Choirul | Rungkut – Berbek Industri |
| Panel | CV. Garahan Jati | Rungkut – Berbek Industri |
| RCP Dia. 600 mm | PT. Supra Surya Indonesia | Retroindo – Gresik |
| Panel | PT. Binamaju Grahamitra | Villa Bukit Mas |
| Panel | PT. Angga Jaya Utama | Galeria Matahari – Bali |
| RCP Dia. 800 mm | PT. GAT Bangkudulis | Kalimantan |
| RCP Dia. 500 | PT. Hutan Alam | Juanda – Lanudal |
| Panel | PT. Sumber Jaya Sempurna | Surabaya |
| Cable Pits 1500 x 1500 x 1200 | PT. ODG Wormald Ind. | Nestle – Pandaan |
| Panel | PT. Angga Jaya Utama | Galeria Matahari – Bali |
| Minipile 15 x 20 x 600 | CV. Grasindo Bangun Nusantara | Villa Bukit Mas |
| NRCP Dia. 500 mm | CV. Grasindo Bangun Nusantara | Villa Bukit Mas |
| Panel | Bpk. Choirul | Rungkut – Berbek Industri |
| RCP Dia. 500 mm | PT. Baitasari | Tuban |
| Gutter 1250/1000 – 1000 | CV. Budi Luhur | Lamongan |
| RCP Dia. 600 mm | Takenaka – Taisei – HK | Ngurah Rai – Kuta – Bali |
| RCP Dia. 800 mm | PT. Panca Darma Puspawira | Ring Road – Nganjuk |
| Gutter 1250/1000 – 1000 | CV. Budi Luhur | Lamongan |
| Panel | PT. Binamaju Grahamitra | Villa Bukit Mas |
| RCP Dia. 400 mm | PT. Siantar Top | Waru – Sidoarjo |
| Panel | PT. Dextam Contractors | Kletek – Sepanjang |
| RCP Dia. 600 mm | PT. Bumi Rejo | Lamongan |
| Panel | CV. Garahan Jati | Rungkut – Berbek Industri |
| Panel | PT. Metraya Pratama | Rungkut – Berbek Industri |
| Panel | PT. Nusa Raya Cipta | Menjangan – Resort |
| RCP Dia. 700 mm | PT. Sapta Bangun Manunggal | Karang Pilang |
| RCP Dia. 500 mm | PT. Pola Bangun Perkasa | Tanjungsari – Surabaya |
| Cansteen CA – 200 | PT. Takenaka Indonesia | Pandaan |
| Panel | PT. Wiratama Jayaputra | Kalianak Barat, Surabaya |
| Panel | PT. Bakti Samudra Sakti | Benowo, Gresik |
| Curb 300/150/250-600 | PT. Waskita Karya | Penjaringan – Surabaya |
| Box Culvert 1600/1000 | PT. Standardmegah | Beji – Pasuruan |
| Panel | CV. Artako | Beji – Pasuruan |
| Panel | CV. Daya Guna | KIG – Gresik |
| RCP Dia. 300 mm | PT. Supra Surya Indonesia | Driyorejo – Gresik |
| RCP Dia. 600 mm | PT. Baitasari | Base Camp – Gresik |
| Panel | Bpk. Choirul | Rungkut – Berbek Industri |
| Panel | PT. Swadaya Graha | KIG Gresik |
| U – Gutter 560/880 – 1000 | PT. Hutama Karya | Mastrip, Surabaya |
| NRCP Dia. 300 mm | PT. Graha Primula | Villa Bukit Mas |
| RCP Dia. 400 mm | PT. Supra Surya Indonesia | Driyorejo – Gresik |
| RCP Dia. 400 mm | PT. Supra Surya Indonesia | Retroindo – Gresik |
| RCP Dia. 500 mm | PT. Hutan Alam | Juanda – Lanudal |
| RCP Dia. 700 mm | PT. Siantar Top | Waru – Sidoarjo |
| RCP Dia. 400 mm | PT. Ometraco | Prioneer Hibrida Malang |
| RCP Dia. 300 mm | PT. Dextam Contractors | Kletek – Sepanjang |
| Panel | PT. Aneka Jasa Gradika | KIG _ Gresik |
| U – Gutter 300/300 – 600 | PT. Pola Bangun Perkasa | Tanjungsari, Surabaya |
| Retaining Wall 900 x 100 x 1200 | PT. Smelting | Smelting – Gresik |
| LU – Gutter 400 x 500 – 1200 | PT. Sumber Nusantara | Bangil – Pasuruan |
Project 1996
July 28, 2011 by irwanbee · Leave a Comment
Beberapa Proyek PT. LISA CONCRETE INDONESIA 1996
| RCP Dia. 800 – 1000 mm | PT. Kawasan Industrial Gresik | KIG Industrial Estate |
| RCP, Man Hole, Lid Cover | PT. Pacific Golf | Taman Dayu Estate |
| RCP Dia. 300 mm | PT. Astha Saka | Graha Pangeran Building |
| Indofood Factory | ||
| RCP & Man Hole | PT. Balfour Beatty Sakty | Taman Dayu Estate |
| RCP Dia. 500, 700 mm | PT. Citraland Surya | Citra Raya Kota Mandiri |
| RCP Dia. 300, 400 mm | PT. Suryabangun Persada | Enseval Factory |
| RCP Dia. 600 mm | PT. Djabesmen | Wavin Duta Jaya Factory |
| RCP Dia. 500 mm | PT. Poliplas Indah Sejahtera | Poliplas Factory |
| RCP Dia. 600 mm | PT. Indokomas Buana Perkasa | PLTG GIS 500 Kv |
| RCP Dia. 300 mm | PT. Bakti Samudra Sakti | ABC Food Factory |
| RCP Dia. 600 mm | CV. Quarta Wirajaya | Griya Kencana Estate (Housing) |
| RCP Dia. 400 – 700 mm | PT. Adiprima Suraprinta | Adiprima Factory |
| RCP Dia. 300 – 500 mm | PT. Jaya Kukuh Wisesa | PT. Nestle Indonesia |
| RCP Dia. 500 – 1000 mm | PT. Kelolatama Albes | Villa Bukit Mas |
| RCP Dia. 500 – 800 mm | PT. Decorient | Multi Bintang Factory |
| RCP Dia. 500 – 700 mm | PT. Duta Graha Indah | Water Treatment Petrokimia |
| RCP Dia. 1200 mm | PT. Pakuwon Jati | Laguna View |
| RCP Dia. 300 mm | PT. Kartika Cemerlang | Margomulyo Indah Factory |
| RCP Dia. 300 – 800 mm | PT. Etika Darma Conserens | Copper Smelter |
| RCP Dia. 300, 400, 600 mm | PT. Hutama – Sagita Dumez | Bali Nirwana Resort |
| RCP Dia. 300 – 800 mm | Shin Hwa Eng. | PLTU |
| RCP Dia. 400 mm | PT. Tata Mulia Nusantara | Ciputra School |
| RCP Dia. 800 – 1000 mm | PT. Hasana Damai Putra | Delta Sari Housing |
| RCP Dia. 800 mm, Septictank | PT. Dywidag | PLTGU |
| Pipe, Gutter, Slab | PT. Jaya Obayashi | Matsushita L.I |
| RCP Dia. 500 mm | PT. Jawa Nusa Wahana | Pantai Mentari (Housing) |
Project 1999
July 23, 2011 by irwanbee · Leave a Comment
Beberapa Proyek PT. LISA CONCRETE INDONESIA 1999
| RCP Dia. 300, 400 mm | CV. Bima | CV. Bima, Probolinggo |
| RCP Dia. 300 – 500 mm | PT. Hutama Karya | PLTGU Paiton |
| RCP Dia. 400, 600 mm | Takenaka – Taisei – HK | Ngurah Rai – Kuta – Bali |
| RCP Dia. 300 – 800 mm | PT. Koko Gada Agung | H.M. Sampoerna – Pandaan |
| RCP Dia. 800 mm | PT. Wana Eka Asri | Nusantara Plywood – Gresik |
| DCG – Gutter + Cover | PT. Ecco Indonesia | Sidoarjo |
| RCP Dia. 300, 400, 600, 800 mm | Takenaka – Taisei – HK | Ngurah Rai – Kuta – Bali |
| U – Gutter 600/500 – 1000 | PT. Tenda Artika | Irjat – Tulungagung |
| RCP Dia. 800 mm | PT. Tjiwi Kimia | Pabrik Kertas Tjiwi Kimia |
| U – Gutter 800/600 – 1000 | PT. Jati Kuning Madiun | Irjat – Lamongan |
| RCP Dia. 300 – 500 mm | PT. Sumicon Utama | Seed Corn Prod. Plant |
| DCG – Gutter400 AII x 2000 | PT. Ecco Indonesia | Ecco Project, Sidoarjo |
| RCP Dia. 300 mm | PT. Koko Gada Agung | H.M. Sampoerna – Pandaan |
| LU-Gutter 1700/1250-600 | PT. Dharma Bakti Adijaya | Proyek Darmo Hill |
| RCP Dia. 300 – 500 mm | PT. Tata Mulia Nusantara | Ware House Ecco |
| RCP Dia. 400 – 800 mm | Ir. Harry Effendi | Villa Kampial – Nusa Dua |
| Man Hole | PT. Dharma Bakti Adijaya | Darmo Hill Project |
| LU – Gutter 400/500 – 1200 | PT. Ecco Indonesia | Sidoarjo |
| RCP Dia. 800 mm | PT. Mitra Gemilang Makmur | Puri Indah – Sidoarjo |
| NRCP Dia. 800 mm | PT. Abdi Karya | Cheil Samsung – Pasuruan |
| RCP Dia. 1200 mm | CV. Pembangunan | Irjat – Bojonegoro |
| RCP Dia. 800 mm | PT. Panca Darma Puspawira | Ring Road – Nganjuk |
| RCP Dia. 300 mm | CV. Sianjaya | Darmo Permai – Surabaya |
| RCP Dia. 1200 mm | CV. Pembangunan | Ring Road – Nganjuk |
| RCP Dia. 800 mm | PT. Modernatehnik Perkasa | Irjat – Jombang |
| U – Gutter 400/500 – 1000 | PT. Wijaya Karya Beton | Irjat – Madura |
| RCP Dia. 1000 mm | Takenaka – Taisei – HK | Ngurah Rai – Kuta – Bali |
| RCP Dia. 600 mm | PT. Mitra Pemuda | Nestle – Gempol |
| Mini Pile 15 x 20 x 600 | CV. Cipta Adi Sarana | Irjat – Pasuruan |
Project 1998
July 22, 2011 by irwanbee · Leave a Comment
Beberapa Proyek PT. LISA CONCRETE INDONESIA 1998
| RCP Dia. 800 mm | PT. Trisetia Ciptasatya | Canyon Ranch – Tabanan |
| RCP Dia. 300 mm | PT. Graha Primula | Villa Bukit Mas (Housing) |
| Man Hole | CV. Rillose | Proyek PLTGU paiton |
| RCP Dia. 400 mm | PT. Dharmala Land | Graha Family (Housing) |
| RCP Dia. 300, 600 mm | Shinwa Eng. & Const. Co. Ltd. | Paiton Private Power Project |
| RCP Dia. 700, 800 mm | PT. Adhi Karya | H.M. Sampoerna – Pandaan |
| RCP Dia. 300, 800 mm | PT. Sumber Utama Buduran | Nestle – Pandaan |
| Man Hole | PT. Satyamitra Surya Perkasa | PLTGU Project |
| RCP Dia. 300 mm | PT. Ballast Ind. Construction | PLTGU Project |
| Filter Deck Slab | PT. Jaya Kusuma Sarana | PDAM – Sepanjang |
| RCP Dia. 200 – 1200 mm | Takenaka – Taisei – HK – PP – Itochu J.O | Ngurah Rai – Kuta – Bali |
| RCP Dia. 400, 600 mm | PT. Bangun Bali Utama | Puri Wulandari |
| RCP Dia. 500 mm | Toyo Engineering | PLTGU Project |
| LU – Gutter + Cover | PT. HAKA | Sambikerep Indah (Housing) |
| RCP Dia. 300 mm | PT. Ballast Ind. Construction | PLTGU Paiton |
| RCP Dia. 600, 700 mm | PT. Hutama Karya | PLTGU Paiton |
| RCP Dia. 500 mm | PT. Karya Sutarindo | Sukorejo, Pasuruan |
| RCP Dia. 700 mm | PT. Adhi Karya | Irjat – Bojonegoro |
| U – Gutter | PT. Anugerah Karya Agra Sentosa | Boyolangu – Tulungagung |
| RCP Dia. 600 mm | PT. Hutama Takenaka | Pandaan |
| RCP Dia. 300, 500, 600 mm | PT. Hutama Karya | PLTGU Paiton |
| Man Hole | PT. Hutama Karya | PLTGU Paiton |
| RCP Dia. 400 mm | PT. Panca Manunggal | Ngoro Indutrial Park |
| RCP Dia. 300 – 500 mm | PT. Hutama Karya | PLTGU Paiton |
| RCP Dia. 700, 1000 mm | PT. Adhi Karya | Irjat – Bojonegoro |
Proyek Box Culvert Tutup Jalan
July 19, 2011 by poedya · Leave a Comment
SURABAYA – Pengguna jalan yang akan melintas di Jalan Banyu Urip harus lebih bersabar. Pasalnya, pembangunan box culvert (gorong-gorong) membuat sebagian ruas jalan tersebut ditutup.
Kasatlantas Polres Surabaya Utara AKP Yuli Purnomo menjelaskan, penutupan itu dilakukan karena proyek box culvert membutuhkan alat-alat berat. “Untuk sementara, arus lalu lintas kami alihkan ke (Jalan) Girilaya,” ujar Yuli.
Dia mengatakan, Jalan Banyu Urip memiliki kepadatan yang tinggi. Tanpa ada proyek box culvert pun, kemacetan sering terjadi. “Biar tidak makin macet dan mengganggu proyek, sementara roda empat kami alihkan, termasuk lin I dan lin J,” terangnya.
Penutupan sebagian ruas jalan tersebut dilakukan sampai alat berat, seperti ekskavator, ditarik dari proyek. Sayang, walau polisi sudah menutup jalan itu, beberapa angkutan umum masih nekat menyerobot masuk. Terlebih ketika tidak ada penjagaan polisi.
Seperti diketahui, awal Maret lalu dinas bina marga dan pematusan (DBMP) mulai mengerjakan proyek gorong-gorong di Banyu Urip. Selain demi mengatasi problem banjir, proyek tersebut dimaksudkan untuk memecah kemacetan. Sebab, gorong-gorong itu akan diaspal dan dimanfaatkan untuk pelebaran jalan. (gun/kuh/oni)
Source : Jawa Pos 16/04/2009
Underpass Adisucipto Jogja
July 19, 2011 by irwanbee · 2 Comments
Pada Awal tahun 2007 lalu, kami mendapatkan permintaan dari PT. MODERN SURYAJAYA untuk membuat Box Culvert dengan ukuran besar. Dimensi box yang mereka minta adalah lebar 8 meter, dan tinggi 4,5 meter serta beberapa bagian yang mempunyai tinggi 5,75 meter khusus untuk pondasi dudukan travelator. Box ini adalah tantangan terbesar kami saat itu, karena ukuran box terbesar yang sudah biasa kami produksi adalah bentang 5 meter dengan tinggi 5 meter.
Tantangan terbesar dari pembuatan box ini adalah di berat sendiri box yang mencapai 40 ton. Dengan berat tersebut, masalah terbesar yang akan muncul adalah saat transportasi produk BOX dari lokasi pabrik kami di Ngoro (Mojokerto) ke lokasi pemasangan di Bandara Adisucipto (Jogja). Setelah banyak bertukar pikiran antara engineer kami dengan pihak konsultan perencana (CV. CEEC) dan juga pihak pelaksana (PT. MODERN SURYAJAYA), akhirnya kami sepakati bahwa box culvert ini di pecah menjadi 2 bagian, (top component dan bottom component) layaknya RCBC yang telah biasa kami produksi untuk kemudian kami joint di lokasi pemasangan.
Bila mengacu pada guna dari box ini, box culvert ini dipasang untuk menghubungkan lalulintas penumpang dari tempat parkir bandara Adi Sucipto menuju terminal bandara dengan sistem underpass (tertanam dibawah tanah) yang diatasanya terdapat 4 jalur Rel Kereta api. Sungguh merupakan tantangan tersendiri bagi kami, karena produk Box culvert (tunnel) ini harus kedap air (muka air tanah sangat tinggi) dan juga harus kedap suara (suara bising ketika ada Kereta Api melintas diatas box culvert). Untuk menjamin terpenuhinya kekedapan diatas, kami sendiri (PT. LISA CONCRETE INDONESIA) yang men-joint (menggabungkan) RCBC tersebut, serta memasang sealant khusus serta membran anti rembes.
Sebagai pelaksana pekerjaan underpass ini, PT. MODERN SURYAJAYA telah memiliki kemampuan (skill) yang mumpuni dalam melaksanakan mega proyek. Mereka mampu memasang RCBC ini dengan baik sesuai dengan rencana, baik schedule maupun ke presisian posisi pemasangan. Permasalahan yang sering muncul hanyalah rembesan air tanah, karena memang posisi muka air tanah cukup tinggi (hampir 3 meter diatas bottom Box culvert). Hal ini memaksa mereka untuk membuat sumur-sumur baru dan juga menambah pompa baru untuk mengatasinya.
Proses pelaksanaan proyek ini pun tergolong menarik, karena ketika proyek berlangsung, Kereta Api masih tetap harus beroperasi, akan tetapi ini bukan menjadi masalah, karena sebelum box culvert ini dipasang, rel kereta api tersebut telah di modifikasi sehingga berfungsi seperti jembatan yang melewati lokasi proyek.


Foto Underpass Setelah Finishing

Precast Arch Culver Kali Kuning
February 18, 2010 by irwanbee · 3 Comments
Berawal dari Tender yang di menangkan oleh PT. Adhi Karya untuk pembangunan saluran Kali Kuning Jogjakarta, kami mendapatkan kesempatan untuk memproduksi Precast Arch Culvert. Menurut keterangan yang kami himpun dari pihak kontraktor (PT. Adhi Karya) dan pihak owner (PT. Angkasapura), desain sebelumnya dari Arch Culvert ini adalah Cast In Site. Atas pertimbangan masalah waktu yang mendesak, dan untuk tujuan mempermudah kontrol dari Arch culvert, maka kami PT. LISA Concrete Indonesia diberi amanah untuk memproduksi Precast Arch.
Sebagai informasi bahwa pihak Angkasapura berencana untuk meluaskan area bandara, sehingga mereka membutuhkan “Taxi Way” baru untuk mendukungnya. Karena rencana TaxiWay ini berada di atas (melewati) sungai Kuning (Kali Kuning), maka sungai tersebut harus ditutup (seperti layaknya jembatan) untuk dijadikan TaxiWay ini.
Precast Arch Culvert ini dibangun untuk memperpanjang Arch Culvert yang sebelumnya telah ada, sesuai dengan keterangan pihak Angkasapura, bahwa Arch Culvert yang sebelumnya dibangun dengan sistem Cast In Site.
(PT. Lisa Concrete Indonesia produsen Arch Culvert di Indonesia)